Wednesday, February 9, 2011

The Lowes delivery truck was unable to deliver the 130 pieces of 12' sheetrock as close to the house as Joe had hoped. All 16 of us quickly stepped into action to move 70 pieces to the second floor via the second floor deck. Joe built some staging that helped us hoist the sheetrock up to the second floor. The remaining pieces were moved into the first story Kitchen/Family Roon through the back porch sliding door.