Wednesday, February 9, 2011



One group (9 of the 13 0f us) arrives on Monday to Joe and Gloria's house. They have added onto the back of the house and are living in the front section of the house. The front section had been renovated soon after Katrina and only recently did they learn that the sheetrock used in the renovation is toxic. As soon as the back of the house is competed, they will need to gut the front of the house and renovate it for a second time. They opened their hearts to us by sharing their Katrina stories with us and we fell in love with them immediately.
Barb, Judy, Julia, Sheila, Mary, Lana, Randy, Jean, Karen & Rick outside Joe and Gloria's home. The 9 of us from St. Michael's along with Randy from the St. Paul's Homecoming Center, and a group of 6 people from Minnesota were given the task of installing sheetrock, insulation and vapor barriers in the back end of the house.
The Lowes delivery truck was unable to deliver the 130 pieces of 12' sheetrock as close to the house as Joe had hoped. All 16 of us quickly stepped into action to move 70 pieces to the second floor via the second floor deck. Joe built some staging that helped us hoist the sheetrock up to the second floor. The remaining pieces were moved into the first story Kitchen/Family Roon through the back porch sliding door.
Phew! We got all of the sheetrock into the house, Now it's time to get down to work!
Barb cranking the sheetrock installer. Boy, did that save our arms!
Karen and Rick teamed up to install vapor barriers on all of the outside walls.
Barb and Judy during one of many supply trips to Lowes. We were on a first name basis with the cashier there by the end of our first day at Joe & Gloria's house.